Connected, secure properties — designed from pathways to handover.

From cable pathways during construction to common-area surveillance and access at handover, planned as one continuous project rather than separate trades.

A newly completed multi-storey commercial development at dusk, still in final fit-out — a service lift and site fence panel to one side, interior floors partly lit, CCTV on the corners and a barrier-controlled entrance.
Real Estate and Construction: the KINNEX layer mixReal Estate and Construction environments are served by camera coverage, network and wi-fi, doors and credentials, hardware and licences, support and amc — designed together around the site rather than bought separately.REAL ESTATE ANDCONSTRUCTIONYour environmentSEECamera coverageCONNECTNetwork and Wi-FiACCESSDoors and credentialsSUPPLYHardware and licencesOPERATESupport and AMC

Layer mix

The layers KINNEX designs together for this environment. Each one links to its own solution page below.

Operational realities

What actually creates pressure here

The conditions that decide whether infrastructure holds up in this environment.

  1. 01Multiple contractors need to coordinate cable pathways before walls close up.
  2. 02Common-area surveillance and access control are expected at handover, not added later.
  3. 03Drawings and as-built documentation need to survive the handover to facility management.
  4. 04Ongoing AMC needs to start the moment the building is occupied, with no gap in support.

The site, in 3D

From site works to handover

Temporary site cameras and Wi-Fi during construction, then the permanent building systems at handover.

  • Site cameras
  • Site Wi-Fi
  • Gate control
  • Handover

Real-time 3D illustration of a typical site, not a specific client project.

Capability catalogue

What we can set up for this environment

27 capabilities, scoped, sourced and delivered under one contract. Search for the exact term you use.

Low-voltage design and delivery for projects8
  • Extra-low-voltage (ELV) design from architectural drawings
  • Structured cabling and telecom rooms
  • CCTV, access control and intercom
  • Wi-Fi and in-building mobile coverage coordination
  • Fire alarm, public address and emergency systems
  • Building management system (BMS) integration
  • Coordination with MEP, interior and civil contractors
  • Bills of quantities, tender documents and submittals
Commercial and residential developments7
  • Office towers, IT parks and malls
  • Apartments, villas and townships
  • Warehouses and industrial parks
  • Hospitals, hotels and educational campuses
  • Smart-building and smart-home options
  • Parking, ANPR and EV-charging access
  • Digital signage and wayfinding
Site and construction phase6
  • Temporary site CCTV and access control
  • Site offices, networks and connectivity
  • Material and labour attendance systems
  • Progress monitoring with time-lapse cameras
  • Phased installation aligned to the programme
  • Snag lists, testing and handover
Handover and operations6
  • As-built drawings, test records and manuals
  • Training for facility teams
  • Annual maintenance with an agreed SOP and SLA
  • Facility technology management
  • Warranty coordination
  • Tenant onboarding and fit-out support

Lifecycle path

New-build projects need cabling and pathway coordination during construction; existing properties more often need an upgrade, audit or a takeover of AMC support.

How we take this on

One contract. The right specialist for every part

Your project is wider than any single team. We scope all of it, source all of it and carry the responsibility for all of it.

  1. 01

    Scope

    We survey, size and specify against standards and your operating reality, not against a brochure.

  2. 02

    Source

    Any make, any model, from the manufacturer, distribution or registered importers. GST-compliant invoicing, warranty and returns handled for you.

  3. 03

    Deliver

    KINNEX engineers do the work we do every day. Where a job needs a specialist, we bring in the right expert team as a sub-order under your single contract.

  4. 04

    Own

    One scope, one SOP, one SLA and one point of accountability, whoever is on site.

Standards and terms

Standards we design to, and the terms you will hear

Specifications are written against recognised standards. Here is the vocabulary, in plain language.

  • National Building Code of India
  • IS 2189 and NFPA 72 (fire alarm)
  • TIA-568 and ISO/IEC 11801 cabling
  • BACnet and KNX (building automation)
  • ONVIF (CCTV interoperability)
  • IGBC and GRIHA green-building practice (reference)
ELV
Extra-low-voltage systems: data, security, audio-visual and fire alarm, as distinct from power.
MEP
Mechanical, electrical and plumbing contractors with whom ELV work is coordinated.
BMS
Building management system that monitors and controls air conditioning, lighting and plant.
Snag list
The list of defects to fix before a building is handed over.
SOP and SLA
The documented procedures for supporting the systems, and the response targets agreed for them.

Brands

Any make. Sourced, supplied and supported

We specify against your requirement and standards, then source the right product from the manufacturer, distribution or registered importers. Delivered, installed and supported under one contract.

Building management, smart building and automation

BMS, lighting, HVAC controls, energy monitoring, IoT and smart-home platforms.

  • Siemens
  • Honeywell
  • Schneider Electric
  • Bosch
  • Philips Hue
  • Samsung SmartThings
  • Google Home
  • Amazon Alexa
  • Apple HomeKit
  • Home Assistant
  • Daikin
  • Carrier
  • Voltas
  • Trane
  • Mitsubishi Electric
  • Hitachi
  • Panasonic
  • Havells
Show 26 more brands
  • Signify
  • Osram
  • Cree
  • ABB
  • Hager
  • Shelly
  • Ecobee
  • Ring
  • Arlo
  • Wyze
  • Johnson Controls
  • Delta Electronics
  • Tridium
  • Legrand
  • Lutron
  • Crestron
  • Control4
  • Aqara
  • Tuya
  • Sonoff
  • Blue Star
  • Anchor
  • Wipro Lighting
  • Eaton
  • Fibaro
  • Nest

Access control, biometrics and attendance

Readers, controllers, biometric terminals, turnstiles, barriers and locks.

  • HID Global
  • ASSA ABLOY
  • Nedap
  • Honeywell
  • Bosch
  • IDEMIA
  • Yale
  • Samsung
  • Hikvision
  • Dahua
  • Brivo
  • Axis Communications
  • Gunnebo
  • FAAC
  • Nice
  • ZKTeco
  • eSSL
  • Suprema
Show 20 more brands
  • Matrix Comsec
  • Paxton
  • Salto
  • dormakaba
  • Gallagher
  • Lenel S2
  • Anviz
  • Realtime
  • Godrej Security Solutions
  • Aqara
  • Kantech
  • CEM Systems
  • Biomax
  • VingCard
  • Saflok
  • Onity
  • Magnetic Autocontrol
  • Tiso
  • Came
  • BFT

Structured cabling and passive infrastructure

Copper, fibre, patching, racks, enclosures and test equipment.

  • Belden
  • TE Connectivity
  • Molex
  • Siemon
  • Nexans
  • Finolex
  • D-Link
  • Schneider Electric
  • HellermannTyton
  • Corning
  • Fluke Networks
  • Prysmian
  • Amphenol
  • Havells
  • Leviton
  • Hubbell
  • Krone
  • Rittal
Show 20 more brands
  • VIAVI
  • Fujikura
  • Tyco
  • Panduit
  • CommScope
  • Legrand
  • R&M
  • Polycab
  • KEI
  • RR Kabel
  • Sterlite Technologies
  • Systimax
  • Anchor
  • Optical Cable Corporation
  • Dintek
  • Netrack
  • Valrack
  • EXFO
  • Fibrefab
  • Lapp Group

Fire alarm, life safety and public address

Detection, alarm, voice evacuation, PA and sound systems.

  • Honeywell
  • Bosch
  • Siemens
  • Kidde
  • Shure
  • Tyco
  • Hikvision
  • Bose
  • Sennheiser
  • Electro-Voice
  • Yamaha
  • Audio-Technica
  • Pioneer
  • Eaton
  • Apollo Fire Detectors
  • Ravel
  • Agni
  • Notifier
Show 8 more brands
  • Hochiki
  • TOA
  • Ahuja
  • Biamp
  • Johnson Controls
  • JBL Professional
  • QSC
  • Crown

Product names, logos and brands are property of their respective owners and are used for identification only. Don't see what you need? We can usually source it, including through registered importers.Ask us.

Questions

Frequently asked questions

Yes — cable pathways, containment and rough-in work are planned around the wider construction schedule, not in isolation.

As-built network and CCTV diagrams, a cable labelling schedule and an access-control administration guide are handed to facility management at handover.

Yes, through an AMC arrangement that starts as soon as the building is occupied, so there is no gap in support.

Request an assessment for your site

Tell us about the environment and the constraint. We will come back with the right next step, not a generic quote.